MANUAL USE AND MAINTENANCE VISPA 35E ED. 10-2008 EN IDoc. 10003872 Ver. AA
10MACHINE PREPARATION 7. RECOVERY TANK Check the recovery tank is correctly inserted in its housing, and that the tubes are correctly inserted
11WORK 1. PREPARING TO WORK Before fitting the tanks, it is necessary to carry out certain operations: 1. check the switches are in the off (“0
12WORK 3. FORWARD MOVEMENTS The traction of these machines is obtained by means of the brush which, working slightly inclined, is able to drag th
13AT THE END OF THE WORK At the end of the work, and before carrying out any type of maintenance, perform the following operations: 1. Turn off
14DAILY MAINTENANCE ATTENTION: Disconnect the power cable from the mains socket before carrying out any maintenance operations. 1. CLEANING
15DAILY MAINTENANCE 3. REPLACING THE SQUEEGEE RUBBERS Check the state of wear and tear of the squeegee rubbers and, if necessary, replace them.
16PERIODIC MAINTENANCE 1. CLEANING THE SQUEEGEE TUBE Periodically, or whenever suction seems to be unsatisfactory, check the squeegee tube is n
17TROUBLESHOOTING 1. ELECTRICAL SYSTEM SAFETY The machine is fitted with a thermal trip unit with manual reset. The brush motor is reset by res
18CHOOSING AND USING THE BRUSHES POLYPROPYLENE BRUSH (PPL) Used on all types of floors. Good resistance to wear and tear, and hot water (no great
19EC DECLARATION OF CONFORMITY The undersigned company: COMAC S.p.A. Via Ca’ Nova Zampieri no. 5 37057 San Giovanni Lupatoto (VR), Italy declares
The contained descriptions in the present publication are not binding. The company therefore reserves itself the right to bring in whatever moment po
20 COMAC spa Via Cà Nova Zampieri, 5 – 37057 San Giovanni Lupatoto – Verona – ITALY Tel
3CONTENTS ON CONSIGNMENT OF THE MACHINE...
4On consignment of the machine When the machine is consigned to the customer, an immediate check must be performed to ensure all the material men
5 TECHNICAL DESCRIPTION UM Vispa 35E Rated power W 480 Working width mm 350 Width of rear squeegee mm 440 Work capacity m2/h 1050 Water consu
6SYMBOLS USED ON THE MACHINE Tap symbol Used to indicate the solenoid valve switch Voltage symbol Used to indicate the machine's voltag
7GENERAL SAFETY REGULATIONS The regulations below must be carefully followed in order to avoid harm to the operator and damage to the machine.
8MACHINE PREPARATION 1. HANDLING THE PACKED MACHINE The machine is contained in specific packaging. Every pallet consists of four machines arra
9MACHINE PREPARATION 4. CONNECTING THE MACHINE For the connection, you must: 1. connect the extension lead to the plug on the handlebars 2.
Commentaires sur ces manuels